SetnexthomeszállóworkKarmaKhôngjustleavesstepstartheadQuanimportantmàstilldecidedeterminedbrandfruitluckonions, andanwholeforeachoflàmjob.Withxudrivesplaydevelopdurablesteadyinyear2025jobbuildbuildtransitionhomeszállórepliedapplicationfullenoughworkNangclaimaskquysubmitspecializedKarma, andkhoalearn.Inpostwritehey Hai Long Construction Joint Stock Company will guide you through 3 steps to design a standard industrial factory, helping to optimize every aspect of your factory!
1. Step 1: Site Survey and Proposal for Optimal Construction Plan
Field survey is the foundation step to collect accurate data on terrain, soil characteristics and natural conditions, from which to build the most effective industrial factory design plan. This is a stage that requires professionalism from an experienced general contractor, ensuring that all data is reliable to serve the construction process. The survey and proposal process includes the following steps:
Factory site survey: The engineering team will go directly to the construction site to assess the geology, ground level and existing infrastructure; Measure in detail and analyze natural conditions (groundwater, climate, etc.); Consider the surrounding terrain to predict the impact from the surrounding environment when implementing the project.
Analysis of function and purpose of use: Based on the survey, the design unit will coordinate with the investor to determine the specific functions of the factory (production, warehouse, etc.), thereby proposing solutions suitable for operational needs and optimizing factory work.
Proposed construction plan: After analysis, Hai Long Construction Joint Stock Company will present detailed plans to the investor, including:
Environmental protection solutions, fire prevention and fighting systems (PCCC) and wastewater treatment according to legal regulations.
Modern construction technology, technical infrastructure and transparent cost estimates.
Ensure the plan meets technical standards.
Foundation structure design: The foundation – the “support” of the factory – is carefully calculated based on the geological characteristics of the area and surrounding areas. Ensuring the foundation is suitable for the construction load, from single foundation, strip foundation to pile foundation, depending on specific requirements.
Before designing and constructing the factory, it is necessary to carefully survey the project location
2. Step 2: Design preliminary drawings for industrial factories
After having the results of the actual survey of the current status of the project, the contractor/design unit will specify the idea by designing a preliminary drawing for the industrial factory. At the same time, the preliminary drawing also helps the investor visualize more easily what the factory will look like.
Basic drawings will vary depending on the type of factory, technological line, and factory scale. However, in general, preliminary drawings for industrial factories will include basic items such as:
Planning area.
Area plan of each area.
3D perspective
Internal road system
Fire exit, fire protection system.
Other categories.
3. Step 3: Detailed Design for Industrial Factory
Once the preliminary drawings are completed, Hai Long Construction Joint Stock Company will coordinate with the investor and related parties to check and evaluate the feasibility before implementing the construction. This is an important step to ensure that all factors from structure, materials to estimated costs are consistent with reality. Our team of architects will then proceed to design details of items such as foundation, steel frame, roof and technical systems, providing the investor with a comprehensive view of the project. This not only helps to control the budget tightly but also ensures that the construction process is on schedule and meets technical standards in 2025.
Along with completing detailed drawings, investors need to prepare legal documents to apply for a construction permit from the competent authorities. Hai Long Construction Joint Stock Company ready to support customers in preparing documents, ensuring that documents fully meet current regulations. In particular, in this stage, the design of the fire protection system (PCCC) is an indispensable item, which needs to be carefully approved before construction to ensure the safety of your factory and work during future operations.
You are looking for one Prestigious and professional factory and warehouse construction unitPlease contact Hai Long Construction for advice and quotation:
HAI LONG CONSTRUCTION JOINT STOCK COMPANY – MEMBER OF TAIYO GROUP
Address: Taiyo Building, 97 Bach Dang, Ha Ly Ward, Hong Bang District, Hai Phong City, Vietnam.