Home / OPENING THE NATIONAL HIGHWAY EXIT FOR THE 532 BILLION VND INDUSTRIAL CLUSTER IN PHU THO
OPENING THE NATIONAL HIGHWAY EXIT FOR THE 532 BILLION VND INDUSTRIAL CLUSTER IN PHU THO
hailongjsc|
Phu Tho – The project to build a road connecting National Highway 2 with Phu Ho Industrial Park in Phong Chau Ward is being urgently constructed.
Phu Ho Industrial Cluster was established under Decision No. 769/QD-UBND dated April 14, 2023 of the People's Committee of Phu Tho province, then the detailed planning at a scale of 1/500 was approved under Decision No. 3362/QD-UBND dated October 11, 2023 of the People's Committee of the old Phu Tho town.
The Phu Ho Industrial Cluster Infrastructure Investment and Construction Project is invested by Nam Hoang Viet Joint Stock Company, with an estimated total investment of 532 billion VND. The project location is in Phong Chau ward (former Phu Ho commune).
According to the reporter of Lao Dong Newspaper in late November, the project "Construction of traffic road to Phu Ho industrial cluster, Phu Tho town" - construction of a road connecting Phu Ho industrial cluster with National Highway 2 is under construction.
The route connecting National Highway 2 to Phu Ho Industrial Park. Photo: To Cong.
It can be seen that the construction unit is carrying out the work of digging and filling the roadbed. The road is being built through agricultural land and houses of some households; the connection point between this road and National Highway 2 (at Km81+440) is being expanded…
This project has a total investment of nearly 55 billion VND, with Phong Chau Ward People's Committee as the Investor, winning the construction package with a price of more than 26 billion VND and construction from the end of May 5.2025 to present is a joint venture of 2 contractors: Van Thang Construction and Mechanical Joint Stock Company and Long Vuong Company Limited.
Master plan map of land use of Phu Ho industrial cluster. Photo: Planning.
According to the project documents, the construction package will build a traffic route to Phu Ho industrial cluster with a route length of 473,39m, designed according to urban road standards, roadbed width of 35m, road surface width of 22m, median width of 2m, sidewalk width on each side of 5,5m...
Talking to Lao Dong Newspaper reporter, Mr. Thang - Vice Chairman of Phong Chau Ward People's Committee - said that up to now, the project of building traffic roads to Phu Ho Industrial Cluster, Phu Tho Town is implementing the construction of the roadbed, the estimated volume is about 20%.
Regarding site clearance, the total land recovered for the project is about 2,3 hectares. Up to now, the compensation plan has been approved for 28 households (1,73 hectares) with an amount of about 11,7 billion VND, all of whom have received the money (3 households remaining).
The above traffic project is implemented with the goal of connecting Phu Ho industrial cluster with National Highway 2 and other routes in the area; meeting the needs of travel, trade and transportation when Phu Ho industrial cluster comes into operation. At the same time, continue to develop the traffic network and promote local socio-economic development.