HAI LONG

Project of coal storage - thermal power plant Vung Ang 1

Construction and erection of steel structure 2 coal warehouses - Vung Ang Thermal Power Plant Project No. 1

- Location: Ky Loi Commune, Ky Anh, Ha Tinh.
- Construction time: 2010-2011
- Value 275.898.400.000VND
Investor: Vietnam National Oil and Gas Group

Right in the beginning of 2011, with the trust of Bach Dang Construction Corporation and the Investor of Vietnam National Oil and Gas Group, Hai Long Construction Joint Stock Company was selected as the full production contractor. set of more than 5.200 (five thousand two hundred) tons of steel structure for 02 largest coal warehouses in Southeast Asia, with an area of ​​32.760 (Thirty two thousand, seven hundred and sixty) m2 / 1kho of Vung Ang Thermal Power Project , FGD area, power distribution yard, product manufacturing process from material import, billet preparation, cleaning, priming, composite jig, finishing welding, pre-painting cleaning, intermediate painting and paint finishing, packaging and shipping according to European standards DIN EN 10025, 10029, 10210, and Japanese standard JIS G3496

Up to now, the steel structure products of Bach Dang Pre-Engineered Steel Factory are highly appreciated by the Investor of Vietnam Oil and Gas Group and FL Smith Consulting for their quality, comply with the correct process and have been put into use to ensure the correct progress of the National key project.

Chinese (Simplified)EnglishJapaneseKoreanVietnamese