Fans-tech Factory Project (Vietnam)
Bac Tien Phong Industrial Park, Quang Yen, Quang Ninh
Đại Loan
General contractor
Thai Ha Industrial Park (phase 1), Ha Nam province
The factory is invested on a land area of more than 25.000 m2, construction area of more than 13.000 m2. Total project investment capital is 9 million USD with items: factory 1 includes 2 floors with an area of 2.880 m2/floor; Factory 2 includes 2 floors with an area of 4.150 m2/floor; steel structure wall corrugated panel; 2-storey office building with 1.302 m2/floor of reinforced concrete structure and synchronous auxiliary items. The project will be constructed within 6 months.
Construction area
Factory