Pourin Special Welding Vietnam Manufacturing Co., Ltd. project
Nam Dinh Vu Industrial Park (zone 1), located in Dinh Vu - Cat Hai economic zone, Dong Hai 2 ward, Hai An, Hai Phong
Đại Loan
General contractor
Thai Ha Industrial Park (phase 1), Ha Nam province
The factory is invested on a land area of more than 25.000 m2, construction area of more than 13.000 m2. Total project investment capital is 9 million USD with items: factory 1 includes 2 floors with an area of 2.880 m2/floor; Factory 2 includes 2 floors with an area of 4.150 m2/floor; steel structure wall corrugated panel; 2-storey office building with 1.302 m2/floor of reinforced concrete structure and synchronous auxiliary items. The project will be constructed within 6 months.
Construction area
Factory