Project of coal storage - thermal power plant Vung Ang 1

Investor: Vietnam

Location: Ky Anh, Ha Tinh

Area: 33.000 m2

Total investment: 276 billion VND

Steel structure volume: 8000 tons

Scope of cooperation: Production and erection of steel structures

Right at the beginning of 2011 with the trust of Bach Dang Construction Corporation and the investor of Vietnam National Oil and Gas Group, Hai Long Construction and Installation Joint Stock Company was selected as the contractor to manufacture and supply the whole system. set more than 8.000 tons of steel structure for 02 largest coal warehouses in Southeast Asia, with an area of ​​32.760 (Thirty two thousand, seven hundred and sixty) m2/1 warehouse of Vung Ang Thermal Power Project, FGD area, yard power distribution, product manufacturing process from inputting raw materials, preparing workpieces, cleaning, priming, assembly mounting, finishing welding, pre-painting, intermediate and finishing paint, packaging and export goods according to European standards DIN EN 10025, 10029, 10210, and Japanese standards JIS G3496

Up to now, the steel structure products of Bach Dang Pre-Engineered Steel Factory are highly appreciated by the Investor of Vietnam Oil and Gas Group and FL Smith Consulting for their quality, comply with the correct process and have been put into use to ensure the correct progress of the National key project.

Some pictures of the project:

 

Get a free consultation
and Design Now Quotation

Chinese (Simplified)EnglishJapaneseKoreanThaiVietnamese