General information
NOI BAI industrial zone Approved as a multi-industry industrial park, with a synchronous technical infrastructure system, convenient transportation location with easy access to residential areas and close to national highways. Specifically, the West - South of the industrial park borders Noi Bai International Airport, in front of the industrial park there is Provincial Road 131 running through, connecting National Highway 3 with National Highway 2 and Thang Long - Noi Bai Expressway. With an ideal location, Noi Bai Industrial Park attracts 40 foreign investors to invest in Noi Bai Industrial Park mainly from Japan, Thailand, America, Saudi Arabia, Malaysia, Singapore, Taiwan and most recently France.
General information
- Name: Noi Bai Industrial Park - Hanoi
- Scale: 115 Ha
- Fill rate: 100%
- Infrastructure usage fee: $120-150
- Industry attracting investment: Mechanical industry, electronic industry, precision industry, light industry, information technology
Geographical location
The industrial park is located in Quang Tien and Mai Dinh communes, Soc Son district, Hanoi city. Noi Bai Industrial Park is located in a convenient transportation location with easy access to residential areas and near national highways. Specifically, the West - South of the industrial park borders Noi Bai International Airport, in front of the industrial park there is Provincial Road 131 running through, connecting National Highway 3 with National Highway 2 and Thang Long - Noi Bai Expressway.
Goods entering and leaving the Industrial Park can be easily transported by road, sea and air:
- 30km from Hanoi City Center;
- 5km from Noi Bai Airport;
- 13km from Trung Gia - Soc Son railway station;
- 140km from Hai Phong Port
Infrastructure system at Noi Bai Industrial Park - Hanoi
Regarding the internal transportation system, The industrial park's internal road design is in the form of a checkerboard with the main road 40m wide with 4 lanes, each lane wide, branch roads 35m wide with 4 lanes. Internal roads are invested to connect to each plot of land with standard road bed loads, ensuring container trucks and large trucks operate normally.
Regarding power supply, The transformer station was built right in the Industrial Park to best ensure the electricity needs of businesses in the Industrial Park. The 110KV line is connected to the fence of each factory in the industrial park.
Regarding clean water supply systems, The water supply system is invested underground along the roads with total capacity.
Regarding wastewater treatment systems, The industrial park's wastewater treatment plant was built with a total capacity of 2.800m3/day and night. Enterprises are responsible for on-site wastewater meeting column B standards - QCVN 40: 2011/BTNMT standards before being discharged into the industrial park's general wastewater treatment system.
Current status attracts investors to participate
Noi Bai Industrial Park is currently 100% filled with 40 operating businesses, mainly businesses from Japan.