Home Steel structure erection capacity

CAPACITY
ENGINEERING
STEEL STRUCTURE

With many years of experience in the field of design and construction of pre-engineered steel buildings, Hai Long is proud to own an elite, skilled and dedicated technical team along with a steel structure factory with a capacity of 15,000 tons. each year is equipped with specialized lines of modern machinery. Hai Long has participated in the construction of many large and small steel structure projects across Vietnam and has brought the highest quality to the investor for more than 2 decades. We are committed to providing the best quality of service, ensuring fast construction progress, technical and safe construction quality.

3
INSTALLATION TEAM
20 +
ENGINEER
30 +
PROJECTS FOR INSTALLATION

organizational chart

CONSTRUCTION AND CONSTRUCTION PROCESS

01
RECEIVING AND STORAGE
The process of receiving and storing materials should be adequate and gathered in an appropriate location to facilitate the erection process.
02
CONSTRUCTION INSTALLATION BULONG FOOD
Installing bolts is the first stage of the erection process, so it is necessary to install the foundation bolts correctly, according to the standards.
03
CONSTRUCTION AND CONSTRUCTION STEEL Structural FRAME, WOOD
This is the main installation part of pre-engineered steel buildings, usually installed from far to near, starting from the steel structure system to installing purlins.
04
CONSTRUCTION OF corrugated iron roof
The erection of the roof corrugated iron is carried out after the erection of the main frame has been completed and the bolts and bracing are correctly aligned.
05
COMPLETE PROJECT
As the final stage of the construction phase, this is the step to thoroughly check each structural part as the connection point between the parts.