HAI LONG

steel structure
erection procedure

01
FOUNDATION CONSTRUCTION
The foundation is one of the most important factors to be kept in mind when building, a decisive factor for the solidity, sustainability and the foundation to support the whole building.
02
RECEIVING AND STORAGE
The process of receiving and storing materials should be adequate and gathered in an appropriate location to facilitate the erection process.
03
BODY CONSTRUCTION
After completion and acceptance of the foundation, the contractor will proceed to construct the reinforced concrete body or build a pre-engineered steel building.
04
CONSTRUCTION INSTALLATION BULONG FOOD
Installing bolts is the first stage of the erection process, so it is necessary to install the foundation bolts correctly, according to the standards.