Chia Cheng Vietnam Factory Project – Phase 1
Thai Ha Industrial Park (phase 1), Ha Nam province
Korean
Production of steel structures
14.500 Tons
Trang Due Industrial Park, Hai Phong
Continuing success from LG Display Factory project With a contract to supply 9300 tons of steel structures, Hai Long Construction continues to be a reputable partner chosen to provide steel structures for the LG Innotek project with an output of up to 14.000 tons. This cooperation not only marks an important step forward but also demonstrates the strong potential for cooperation between the two sides. The project requires focus and strict control from both sides to ensure progress and quality. Production is expected to take place in 4 months.
Volume of Steel Structure
Factory
Office building