Chia Cheng Vietnam Factory Project – Phase 1
Thai Ha Industrial Park (phase 1), Ha Nam province
Korean
Steel structure production & erection
3.500 Tons
Gia Vien, Ninh Binh
Hyundai Thanh Cong Factory No. 2 was built on an area of 50 hectares (in Gian Khau industrial park, Gia Vien district, Ninh Binh) with a total investment capital of over 3.200 billion VND. The capacity of Hyundai Thanh Cong No. 2 is designed to reach 100.000 vehicles/year, which will increase the total production and assembly capacity of Hyundai vehicles in Vietnam to 170.000 vehicles/year.
Volume of steel structure
Factory
Office building