Trang Due Industrial Park Phase 3 project has a total expected investment of about 8.000 - 10.000 billion VND. According to the investor, Trang Due 3 Industrial Park will attract projects in the fields of electronics, electronic components, and precision mechanics, especially large projects such as LG and LG's satellites.
Regarding infrastructure, Trang Due Industrial Park Phase 3 project is built with a good power supply system, clean water supply system from 2 sources, capacity of more than 20.000 m3, wastewater treatment plant with capacity of 13.800 m3; ensure the provision of infrastructure conditions for businesses in the Industrial Park. The main road of the Industrial Park ensures 6 lanes to help vehicles circulate stably and conveniently for workers.
1. Overview of information about Trang Due industrial park
Trang Due Industrial Park was built with a total scale of 401 hectares, divided into two construction phases. This is a project invested by Saigon - Hai Phong Industrial Park Joint Stock Company.
-
Construction phase 1: Construction of 187 hectares and carried out in 2013
-
Construction phase 2: Construction of 214 hectares, officially started in 2014.
The goal when building Trang Due Industrial Park is to attract a large number of investors. Most focus on activities in the manufacturing sector with high development potential such as electronic components, household appliances, high-tech equipment, etc.
Up to now, the industrial park has gathered more than 60 projects real estate domestically and internationally with a total investment capital of more than 5 billion USD.
today, Trang Due Industrial Park has a total scale of 1.088 hectares. Of which, phases I and II are 401 hectares, completely filled with 88 projects, 85% of which are foreign direct investment (FDI) projects and the Trang Due Industrial Park project phase 3 has a scale of 687 hectares.
Geographical location
According to the planning map of Trang Due 3 industrial park, the project is built in Le Loi commune, An Duong district, city. Hai Phong. Located right on National Highway 10 and between National Highway 5A and the highway from Hanoi to Hai Phong. These are two strong blood routes in the Northern region.
Besides, Trang Due 3 Industrial Park can connect with National Highway 19 to serve international visitors and transport goods from the North. Therefore, it can be seen that the project possesses an extremely prime location, being one of the attractive investment destinations at home and abroad.
The infrastructure
Trang Due Industrial Park is designed according to the architectural complex model including: industrial park, urban area, utility service area, entertainment activities,... Therefore, infrastructure investment is focused on. to achieve the desired effect of the investor.
-
Construction of internal traffic system: Modern design, compliance with state regulations. Specifically, the main road is 32m wide divided into 4 lanes and the fast lane is 23m wide divided into 2 lanes.
-
Power source: Supplied from the national power grid at 110/35/22kV station with capacity consumption of 2x40MVA.
-
Construction of a garbage and wastewater treatment system: Wastewater will be collected at a general treatment station operating with a capacity of 5000m3/day. After being collected, waste will be transported out of the industrial park.
2. Objective of expanding Trang Due 3 Industrial Park
The goal of phase 3 of the Trang Due Industrial Park project is an integrated industrial park with modern infrastructure. At the same time, synchronously establish industrial park phase 1 and industrial park phase 2. Prioritize the development of clean industry. Most of the area planned to expand the industrial park phase 3 is agricultural land and water surface land. Partly connected to National Highway 10 to create synchronization with Trang Due industrial park phases 1 and 2.
3. Planning orientation
Trang Due Industrial Park phase 3 is expected to be completed in the period 2021 - 2025. Recently, the project has handled a large amount of work and just completed site clearance. Besides, the investor also builds industrial park infrastructure and calls for attracting investment capital.
Trang Due Industrial Park phase 3 is oriented towards advanced goals and environmental protection. In addition, around the industrial park, additional housing areas for workers and utility services will be built. The fighting workshop is one of the model ecological industrial parks of Hai Phong.
Hopefully the information about the project and the planning map of Trang Due 3 Industrial Park will bring useful information to you in the investment research process. Good luck!